Easy Floor Robotics

Easy Floor Robotics logo
4 2 Reviews
Popular

Easy Floor Robotics

We can separate flooring problems into 3 areas: human, economic, and design aspects. The human problem is creating a consistent high-level finish. All of the tasks of seamless floor application are done manually: mixing, loading the materials into a mixer bucket, pouring materials, painting, sanding, rolling, squeegeeing, and even creating texture. The economic problem is that nearly 90% of construction companies in the US are unable to find the workers they need. Labor costs and shortage of skilled laborers are increasing. The last problem is customization: today architects are forced to choose tiles from standard designs that are available in the market, and this limits their creativity.We can separate flooring problems into 3 areas: human, economic, and design aspects. The human problem is creating a consistent high-level finish. All of the tasks of seamless floor application are done manually: mixing, loading the materials into a mixer bucket, pouring materials, painting, sanding, rolling, squeegeeing, and even creating texture. The economic problem is that nearly 90% of construction companies in the US are unable to find the workers they need. Labor costs and shortage of skilled laborers are increasing. The last problem is customization: today architects are forced to choose tiles from standard designs that are available in the market, and this limits their creativity.

 

One-Liner / Elevator pitch

Easy Floor Robotics develops autonomous robotic technology for floor coating and topping floors - the I-Robot of the flooring market.

 

What make you different from competitors or alternative solutions

We have one Chinese competitor, Bozhilin Construction Robot (Bright Dream Robotics), who tries to automate the application of epoxy floors in underground parking garages and tennis courts. In comparison to their solution, our method is two times faster than theirs, and our robotic system will be able to work autonomously 24/7, while theirs needs constant refilling. Moreover, Sika expert can’t accept their work because they don’t roll in two directions at right angles to each other.

Industry

Industry
ConstructionTech

Tech Stage (TRL)

Tech Stage (TRL)
Prototype validation (TRL 5)

Easy Floor Robotics 2 reviews

Write Your Review
4
2 reviews
  • user 137

    Happy to see them pitch!

  • user 026

    Consolidated vote from the IL committee (ConTech, EcoMotion, Ignite The Spark, PlaneTech and 2 investors)

Write Your Review

Your email address will not be published. Required fields are marked *